| Assessment Year | 2010 |
|---|---|
| Principal Product | lubrication powder |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
60,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,500
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $368,630 | 4,435,199 |
kWh
|
$0.083 |
| Natural Gas | $123,169 | 56,733 |
MMBtu
|
$2.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,336 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,104 | $3,000 | - |
$2,104
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,170 | $1,300 |
$15,170
143,957
kWh
|
- | |
| 03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $5,857 | $80,000 | - |
$5,857
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,818 | $20,818 |
$20,818
198,985
kWh
|
- | |
| 05 | 2.2511: Insulate bare equipment | $65 | $180 | - |
$65
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $929 | $2,160 | - |
$929
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $785 | $400 | - |
$785
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $225 | $360 | - |
$225
-
MMBtu
|
|
| 09 | 2.7135: Install occupancy sensors | $6,528 | $760 |
$6,528
81,600
kWh
|
- | |
| 10 | 2.6124: Establish equipment maintenance schedule | $3,994 | - |
$3,994
49,919
kWh
|
- | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,718 | - |
$1,718
21,480
kWh
|
- | |
| TOTAL RECOMMENDED | $58,193 | $108,978 |
$48,228
495,941
kWh
|
$9,965
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $52,336 | $28,978 |
$48,228
495,941
kWh
|
$4,108
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs