Assessment Year | 2011 |
---|---|
Principal Product | Foam Board Insulation |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
220,700
ft2
|
Annual Production | 215,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $704,455 | 12,203,939 |
kWh
|
$0.058 |
Electricity Demand | $13,114 | 1,696 |
kW-mo/yr
|
$7.73 |
Natural Gas | $57,260 | 12,078 |
MMBtu
|
$4.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $19,544 | $36,000 |
$12,402
213,815
kWh
|
$7,142
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $189 | $427 |
$150
2,573
kWh
|
$39
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,983 | $8,704 |
$1,696
29,250
kWh
|
$310
-
kW-mo/yr
|
$(-174.0) | $1,151 | |
04 | 2.4133: Use most efficient type of electric motors | $7,487 | $13,428 |
$6,331
109,163
kWh
|
$1,156
-
kW-mo/yr
|
- | - | |
05 | 2.4323: Use optimum size and capacity equipment | $965 | $3,337 |
$965
16,644
kWh
|
- | - | - | |
06 | 2.7261: Install timers and/or thermostats | $236 | - |
$236
4,063
kWh
|
- | - | - | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $350 | - |
$296
5,100
kWh
|
$54
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $31,754 | $61,896 |
$22,076
380,608
kWh
|
$8,701
-
kW-mo/yr
|
$(-174.0) | $1,151 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs