Assessment Year | 2011 |
---|---|
Principal Product | Publication Printing and Binding |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $100 M to 500M |
# of Employees | 640 |
Plant Area |
600,000
ft2
|
Annual Production | 52,000,000
units
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,562,500 | 48,922,817 |
kWh
|
$0.052 |
Electricity Demand | $46,196 | 8,069 |
kW-mo/yr
|
$5.73 |
Natural Gas | $904,481 | 179,114 |
MMBtu
|
$5.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $360,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,203 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $265,693 | $277,838 |
$342,941
6,595,001
kWh
|
$51,767
-
kW-mo/yr
|
$(-129,015.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,671 | $21,422 |
$7,495
144,184
kWh
|
$1,176
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,196 | $20,077 |
$9,651
185,409
kWh
|
$1,545
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,215 | $5,303 |
$3,628
69,743
kWh
|
$587
-
kW-mo/yr
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,121 | $3,748 | - | - |
$3,121
-
MMBtu
|
- | |
06 | 2.7231: Use radiant heater for spot heating | $2,000 | $7,588 | - | - |
$2,000
-
MMBtu
|
- | |
07 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $65,425 | $345,000 |
$(-64,311.0)
(-1,236,733)
kWh
|
$(-10,177.0)
-
kW-mo/yr
|
- |
$139,913
-
lb
|
|
TOTAL RECOMMENDED | $360,321 | $680,976 |
$299,404
5,757,604
kWh
|
$44,898
-
kW-mo/yr
|
$(-123,894.0)
-
MMBtu
|
$139,913
-
lb
|
||
TOTAL IMPLEMENTED | $29,203 | $58,138 |
$20,774
399,336
kWh
|
$3,308
-
kW-mo/yr
|
$5,121
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs