Assessment Year | 2010 |
---|---|
Principal Product | frozen pizza |
NAICS | 311412: Frozen Specialty Food Manufacturing |
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
150,000
ft2
|
Annual Production | 50,000,000
units
|
Production Hrs. Annual | 7,764
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $620,977 | 8,812,068 |
kWh
|
$0.070 |
Electricity Demand | $86,906 | 15,528 |
kW-mo/yr
|
$5.60 |
Natural Gas | $74,819 | 10,149 |
MMBtu
|
$7.37 |
Other Gas | $3,300,000 | 1,726 |
MMBtu
|
$1,912.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,169,851 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $115 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $115 | - |
$67
959
kWh
|
$20
-
kW-mo/yr
|
- | $40 | $(-12.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,201 | - |
$1,218
17,386
kWh
|
$278
-
kW-mo/yr
|
- | $528 | $177 | |
03 | 2.7135: Install occupancy sensors | $1,944 | $360 |
$1,725
24,645
kWh
|
$219
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $562 | - |
$562
8,030
kWh
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,411 | $940 |
$2,411
34,439
kWh
|
- | - | - | - | |
06 | 2.4323: Use optimum size and capacity equipment | $613 | $1,248 |
$613
8,760
kWh
|
- | - | - | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $1,978 | $72 |
$310
4,441
kWh
|
$68
-
kW-mo/yr
|
$1,600
-
MMBtu
|
- | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $3,552 | - | - | - |
$3,552
-
MMBtu
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,810 | - |
$9,600
137,147
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $490 | - | - | - |
$490
-
MMBtu
|
- | - | |
11 | 2.4322: Use or replace with energy efficient substitutes | $3,144,671 | $1,170,000 |
$(-182,905.0)
(-26,012,933)
kWh
|
$(-20,046.0)
-
kW-mo/yr
|
- | $(-51,000.0) | $3,398,622 | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $504 | - |
$504
7,200
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $3,169,851 | $1,172,620 |
$(-165,895.0)
(-25,769,926)
kWh
|
$(-18,251.0)
-
kW-mo/yr
|
$5,642
-
MMBtu
|
$(-50,432.0) | $3,398,787 | ||
TOTAL IMPLEMENTED | $115 | - |
$67
959
kWh
|
$20
-
kW-mo/yr
|
- | $40 | $(-12.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs