ITAC Assessment: AM0040
ITAC logo
ITAC Assessment: AM0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FOLDING BOXES
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 720,000
lb
Production Hrs. Annual 0
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,514 721,864
kWh
Natural Gas $1,300 293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,371 - $1,371
12,896
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $953 $4,875 $953
17,292
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $666 - $666
12,016
kWh
04 2.4312: Improve lubrication practices $499 - $499
9,086
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $143 $285 $143
2,638
kWh
TOTAL RECOMMENDED $3,632 $5,160 $3,632
53,928
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs