ITAC Assessment: LM0063
ITAC logo
ITAC Assessment: LM0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Precision Tubes and Assemblies
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 125,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,277 2,687,465
kWh
Electricity Demand $125,424 13,284
kW-mo/yr
Electricity Fees $7,523 -
Natural Gas $60,123 11,697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,244 $140 $911
7,605
kWh
$333
-
kW-mo/yr
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,129 - $1,428
11,934
kWh
$701
-
kW-mo/yr
-
03 2.4238: Do not use compressed air for personal cooling $80 $30 $53
481
kWh
$27
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $828 $232 $572
4,976
kWh
$256
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $68 $85 - - $68
-
MMBtu
TOTAL RECOMMENDED $4,349 $487 $2,964
24,996
kWh
$1,317
-
kW-mo/yr
$68
-
MMBtu
TOTAL IMPLEMENTED $4,281 $402 $2,964
24,996
kWh
$1,317
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs