Assessment Year | 2009 |
---|---|
Principal Product | Sterile Water |
NAICS | 423450: Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers |
SIC | 5047: Medical, Dental, and Hospital Equipment and Supplies |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
91,800
ft2
|
Annual Production | 66,000,000
pieces
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $361,278 | 5,008,052 |
kWh
|
$0.072 |
Electricity Demand | $50,792 | 9,459 |
kW-mo/yr
|
$5.37 |
Natural Gas | $201,684 | 20,626 |
MMBtu
|
$9.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,950 | $19,296 |
$5,876
81,632
kWh
|
$1,006
-
kW-mo/yr
|
- | - | $(-39.0) | $107 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,522 | $458 |
$313
4,352
kWh
|
$32
-
kW-mo/yr
|
- | - | $440 | $737 | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,193 | - | - | - |
$7,193
-
MMBtu
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $875 | $400 | - | - |
$830
-
MMBtu
|
$45
-
Tgal
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $1,524 | $1,260 | - | - |
$1,524
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $137 | $115 |
$137
1,907
kWh
|
- | - | - | - | - | |
07 | 2.4224: Upgrade controls on compressors | $3,067 | $8,134 |
$3,067
42,600
kWh
|
- | - | - | - | - | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $452 | - |
$259
3,600
kWh
|
$193
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $21,720 | $29,663 |
$9,652
134,091
kWh
|
$1,231
-
kW-mo/yr
|
$9,547
-
MMBtu
|
$45
-
Tgal
|
$401 | $844 | ||
TOTAL IMPLEMENTED | $14,318 | $10,367 |
$3,517
48,859
kWh
|
$32
-
kW-mo/yr
|
$9,547
-
MMBtu
|
$45
-
Tgal
|
$440 | $737 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs