ITAC Assessment: IC0166
ITAC logo
ITAC Assessment: IC0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 67,000
ft2
Annual Production 234,293
pieces
Production Hrs. Annual 4,216
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,624 2,130,240
kWh
Electricity Demand $63,440 4,879
kW-mo/yr
Natural Gas $8,530 764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,511 $10,994 $971
18,298
kWh
$663
-
kW-mo/yr
- $877 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,135 $4,045 $1,728
32,607
kWh
$1,469
-
kW-mo/yr
- $(-396.0) $334
03 2.7142: Utilize higher efficiency lamps and/or ballasts $757 $136 $179
3,373
kWh
$130
-
kW-mo/yr
- $6 $442
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,442 $1,720 $934
17,614
kWh
$1,508
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $84 $345 $84
1,574
kWh
- - - -
06 2.7261: Install timers and/or thermostats $134 - - - $134
-
MMBtu
- -
07 2.2692: Use outside cold water source as a supply of cooling water $3,264 $16,200 $1,922
36,258
kWh
$1,342
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $659 - $191
3,600
kWh
$468
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $12,986 $33,440 $6,009
113,324
kWh
$5,580
-
kW-mo/yr
$134
-
MMBtu
$487 $776
TOTAL IMPLEMENTED $2,729 $11,339 $1,055
19,872
kWh
$663
-
kW-mo/yr
$134
-
MMBtu
$877 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs