ITAC Assessment: IC0154
ITAC logo
ITAC Assessment: IC0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product steel wire
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 75,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 2,134
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,567 409,166
kWh
Electricity Demand $7,353 1,502
kW-mo/yr
Natural Gas $41,887 2,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,635 $11,200 $3,966
45,589
kWh
$1,215
-
kW-mo/yr
- - $102 - $(-648.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $964 $433 $715
8,216
kWh
$231
-
kW-mo/yr
- - $192 - $(-174.0)
03 2.7124: Make a practice of turning off lights when not needed $501 - $250
2,872
kWh
$251
-
kW-mo/yr
- - - - -
04 2.7132: Install timers on light switches in little used areas $173 $474 $128
1,472
kWh
$45
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $896 $62
709
kWh
$5
-
kW-mo/yr
- - $36 - $77
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $178 $240 - $418
-
kW-mo/yr
- - - $(-240.0) -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $220 $460 $130
1,495
kWh
$90
-
kW-mo/yr
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $87 - $87
999
kWh
- - - - - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $725 $1,126 - - - $725
-
MMBtu
- - -
10 2.8114: Change rate schedules or other changes in utility service $2,269 - - - $2,269 - - - -
11 2.8113: Purchase gas directly from a contract gas supplier $2,094 - - - - - $2,094 - -
TOTAL RECOMMENDED $12,026 $14,829 $5,338
61,352
kWh
$2,255
-
kW-mo/yr
$2,269 $725
-
MMBtu
$2,424 $(-240.0) $(-745.0)
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs