Assessment Year | 2009 |
---|---|
Principal Product | steel wire |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
75,000
ft2
|
Annual Production | 15,000
units
|
Production Hrs. Annual | 2,134
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,567 | 409,166 |
kWh
|
$0.087 |
Electricity Demand | $7,353 | 1,502 |
kW-mo/yr
|
$4.90 |
Natural Gas | $41,887 | 2,413 |
MMBtu
|
$17.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,026 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,635 | $11,200 |
$3,966
45,589
kWh
|
$1,215
-
kW-mo/yr
|
- | - | $102 | - | $(-648.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $964 | $433 |
$715
8,216
kWh
|
$231
-
kW-mo/yr
|
- | - | $192 | - | $(-174.0) | |
03 | 2.7124: Make a practice of turning off lights when not needed | $501 | - |
$250
2,872
kWh
|
$251
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7132: Install timers on light switches in little used areas | $173 | $474 |
$128
1,472
kWh
|
$45
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $180 | $896 |
$62
709
kWh
|
$5
-
kW-mo/yr
|
- | - | $36 | - | $77 | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $178 | $240 | - |
$418
-
kW-mo/yr
|
- | - | - | $(-240.0) | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $220 | $460 |
$130
1,495
kWh
|
$90
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $87 | - |
$87
999
kWh
|
- | - | - | - | - | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $725 | $1,126 | - | - | - |
$725
-
MMBtu
|
- | - | - | |
10 | 2.8114: Change rate schedules or other changes in utility service | $2,269 | - | - | - | $2,269 | - | - | - | - | |
11 | 2.8113: Purchase gas directly from a contract gas supplier | $2,094 | - | - | - | - | - | $2,094 | - | - | |
TOTAL RECOMMENDED | $12,026 | $14,829 |
$5,338
61,352
kWh
|
$2,255
-
kW-mo/yr
|
$2,269 |
$725
-
MMBtu
|
$2,424 | $(-240.0) | $(-745.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs