ITAC Assessment: IC0146
ITAC logo
ITAC Assessment: IC0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Transmissions
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 186
Plant Area 160,000
ft2
Annual Production 21,200
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,637 2,713,674
kWh
Electricity Demand $46,371 8,635
kW-mo/yr
Electricity Fees $3,294 -
Natural Gas $95,323 9,975
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $11,678 $1,537 - - - $11,678
-
MMBtu
- - -
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $3,159 - $3,159
43,878
kWh
- - - - - -
03 4.652: Replace existing equipment with more suitable substitutes $24,543 $208,785 $2,407
33,428
kWh
$1,439
-
kW-mo/yr
- $20,697
-
MMBtu
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,453 - - - - $1,453
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $815 - $663
9,214
kWh
$279
-
kW-mo/yr
$(-127.0) - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,631 $729 $505
7,013
kWh
$215
-
kW-mo/yr
- - - $777 $134
07 2.7142: Utilize higher efficiency lamps and/or ballasts $548 $211 $64
894
kWh
$5
-
kW-mo/yr
- - - $329 $150
08 2.7124: Make a practice of turning off lights when not needed $541 - $122
1,697
kWh
$419
-
kW-mo/yr
- - - - -
09 2.7135: Install occupancy sensors $1,535 $3,688 $1,105
15,350
kWh
$430
-
kW-mo/yr
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $487 $424 $138
1,920
kWh
$349
-
kW-mo/yr
- - - - -
11 2.6211: Conserve energy by efficient use of vending machines $679 - $389
5,400
kWh
$290
-
kW-mo/yr
- - - - -
12 2.1333: Convert combustion equipment to burn oil $27,915 $32,868 $(-223.0)
(-3,096)
kWh
- - $23,164
-
MMBtu
$4,974
-
gal
- -
13 2.8114: Change rate schedules or other changes in utility service $12,315 - - - $12,315 - - - -
TOTAL RECOMMENDED $87,299 $248,242 $8,329
115,698
kWh
$3,426
-
kW-mo/yr
$12,188 $56,992
-
MMBtu
$4,974
-
gal
$1,106 $284
TOTAL IMPLEMENTED $33,123 $213,837 $7,889
109,580
kWh
$3,147
-
kW-mo/yr
- $20,697
-
MMBtu
- $1,106 $284
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs