Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Computer Peripheral Equipment
NAICS
n/a
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 250,000
ft2
Annual Production 23,560
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $557,481 11,997,949
kWh
Natural Gas $37,917 8,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2691: Shut off cooling if cold outside air will cool process $4,930 $167,000 $4,930
106,096
kWh
- -
02 2.3137: Use power during off-peak periods $12,960 $250 - - $12,960
03 2.7224: Reduce space conditioning during non-working hours $4,930 $2,670 $640
41,618
kWh
$4,290
-
MMBtu
-
04 2.7314: Reduce ventilation air $6,040 $1,270 $470
33,998
kWh
$5,570
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,939 $8,660 $17,624
379,250
kWh
$(-6,685.0)
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $450 $150 - $450
-
MMBtu
-
07 2.6212: Turn off equipment during breaks, reduce operating time $350 $300 $350
7,620
kWh
- -
08 2.4133: Use most efficient type of electric motors $3,410 $6,230 $3,410
73,271
kWh
- -
09 2.7111: Reduce illumination to minimum necessary levels $3,900 $8,300 $3,900
259,672
kWh
- -
10 2.7132: Install timers on light switches in little used areas $810 $2,600 $810
17,292
kWh
- -
11 2.2623: Minimize condenser cooling water temperature $140 $240 $140
9,379
kWh
- -
12 2.2623: Minimize condenser cooling water temperature $240 $1,120 $240
16,120
kWh
- -
TOTAL RECOMMENDED $49,099 $198,790 $32,514
944,316
kWh
$3,625
-
MMBtu
$12,960
TOTAL IMPLEMENTED $49,099 $198,790 $32,514
944,316
kWh
$3,625
-
MMBtu
$12,960
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs