| Assessment Year | 2006 |
|---|---|
| Principal Product | cowhide leather |
| NAICS | 316110: Leather and Hide Tanning and Finishing |
| SIC | 3111: Leather Tanning and Finishing |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
225,862
ft2
|
| Annual Production | 5,500
thousand feet
|
| Production Hrs. Annual | 2,548
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $253,707 | 3,725,872 |
kWh
|
$0.068 |
| Electricity Demand | $54,840 | 12,336 |
kW-mo/yr
|
$4.45 |
| Electricity Fees | $6,049 | - |
|
- |
| Natural Gas | $496,013 | 53,168 |
MMBtu
|
$9.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $146,379 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $103,343 | $192,802 |
$(-610.0)
(-8,966)
kWh
|
$(-187.0)
-
kW-mo/yr
|
$104,140
-
MMBtu
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,880 | - | - | - |
$2,880
-
MMBtu
|
- | - | |
| 03 | 2.4224: Upgrade controls on compressors | $5,541 | $1,690 |
$3,417
50,251
kWh
|
$2,124
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,086 | $2,100 |
$4,086
60,102
kWh
|
- | - | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,057 | - |
$1,057
15,529
kWh
|
- | - | - | - | |
| 06 | 2.2437: Recover waste heat from equipment | $5,809 | $34,020 | - | - |
$5,809
-
MMBtu
|
- | - | |
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $2,442 | $3,500 |
$2,117
31,139
kWh
|
$325
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $11,574 | $88,643 |
$8,879
130,576
kWh
|
$2,695
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,256 | $8,992 |
$4,532
66,645
kWh
|
$1,397
-
kW-mo/yr
|
- | $45 | $282 | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,391 | $8,404 |
$2,424
35,625
kWh
|
$748
-
kW-mo/yr
|
- | $257 | $(-38.0) | |
| TOTAL RECOMMENDED | $146,379 | $340,151 |
$25,902
380,901
kWh
|
$7,102
-
kW-mo/yr
|
$112,829
-
MMBtu
|
$302 | $244 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs