Assessment Year | 1999 |
---|---|
Principal Product | custom printed business forms |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
158,000
ft2
|
Annual Production | 33,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,845 | 8,217,761 |
kWh
|
$0.034 |
Electricity Demand | $131,380 | 16,368 |
kW-mo/yr
|
$8.03 |
Natural Gas | $37,715 | 9,192 |
MMBtu
|
$4.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $240,725 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $233,153 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,823 | $236 |
$2,128
63,306
kWh
|
$695
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,677 | $6,766 |
$4,286
127,491
kWh
|
$1,391
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,089 | $50 |
$822
24,619
kWh
|
$267
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $657 | $399 |
$657
19,637
kWh
|
- | - | - | - | |
05 | 3.8142: Distill contaminated solvents for reuse | $5,826 | $7,750 | - |
$(-526.0)
-
kW-mo/yr
|
$7,949
-
gal
|
$(-1,176.0) | $(-421.0) | |
06 | 4.441: Install automatic packing equipment | $209,151 | $182,650 |
$(-387.0)
(-11,430)
kWh
|
$(-126.0)
-
kW-mo/yr
|
- | $209,664 | - | |
07 | 3.5311: Recover and reuse waste material | $15,502 | $265 | - | - | - | - | $15,502 | |
TOTAL RECOMMENDED | $240,725 | $198,116 |
$7,506
223,623
kWh
|
$1,701
-
kW-mo/yr
|
$7,949
-
gal
|
$208,488 | $15,081 | ||
TOTAL IMPLEMENTED | $233,153 | $189,917 |
$6,027
179,367
kWh
|
$1,960
-
kW-mo/yr
|
- | $209,664 | $15,502 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs