ITAC Assessment: IC0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 185,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,801 4,265,327
kWh
Electricity Demand $120,733 12,876
kW-mo/yr
Electricity Fees $37,836 -
Natural Gas $152,383 21,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $2,168 $3,600 - - $2,168
-
MMBtu
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,864 $89,448 $14,464
490,512
kWh
$400
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,546 $700 $901
25,783
kWh
$645
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $737 - $427
12,191
kWh
$310
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $5,595 $34,679 $3,265
93,925
kWh
$2,330
-
kW-mo/yr
- - - -
06 3.1191: Change procedures / equipment / operating conditions $803 $300 - - - $803
-
Tgal
- -
07 2.4321: Upgrade obsolete equipment $1,895 $8,597 $678
19,396
kWh
$718
-
kW-mo/yr
- - $92 $407
TOTAL RECOMMENDED $27,608 $137,324 $19,735
641,807
kWh
$4,403
-
kW-mo/yr
$2,168
-
MMBtu
$803
-
Tgal
$92 $407
TOTAL IMPLEMENTED $4,451 $4,300 $1,328
37,974
kWh
$955
-
kW-mo/yr
$2,168
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs