Assessment Year | 2004 |
---|---|
Principal Product | Furniture |
NAICS | 337211: Wood Office Furniture Manufacturing |
SIC | 2521: Wood Office Furniture |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
185,000
ft2
|
Annual Production | 24,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,801 | 4,265,327 |
kWh
|
$0.027 |
Electricity Demand | $120,733 | 12,876 |
kW-mo/yr
|
$9.38 |
Electricity Fees | $37,836 | - |
|
- |
Natural Gas | $152,383 | 21,022 |
MMBtu
|
$7.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,608 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,451 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $2,168 | $3,600 | - | - |
$2,168
-
MMBtu
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,864 | $89,448 |
$14,464
490,512
kWh
|
$400
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,546 | $700 |
$901
25,783
kWh
|
$645
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $737 | - |
$427
12,191
kWh
|
$310
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $5,595 | $34,679 |
$3,265
93,925
kWh
|
$2,330
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $803 | $300 | - | - | - |
$803
-
Tgal
|
- | - | |
07 | 2.4321: Upgrade obsolete equipment | $1,895 | $8,597 |
$678
19,396
kWh
|
$718
-
kW-mo/yr
|
- | - | $92 | $407 | |
TOTAL RECOMMENDED | $27,608 | $137,324 |
$19,735
641,807
kWh
|
$4,403
-
kW-mo/yr
|
$2,168
-
MMBtu
|
$803
-
Tgal
|
$92 | $407 | ||
TOTAL IMPLEMENTED | $4,451 | $4,300 |
$1,328
37,974
kWh
|
$955
-
kW-mo/yr
|
$2,168
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs