Assessment Year | 2004 |
---|---|
Principal Product | Frozen Pizza |
NAICS | 311412: Frozen Specialty Food Manufacturing |
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
39,000
ft2
|
Annual Production | 550,000
pieces
|
Production Hrs. Annual | 7,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,009 | 2,714,306 |
kWh
|
$0.039 |
Electricity Demand | $72,365 | 5,894 |
kW-mo/yr
|
$12.28 |
Electricity Fees | $21,125 | - |
|
- |
Natural Gas | $42,558 | 9,450 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,177,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,170,302 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $522 | $400 |
$360
7,816
kWh
|
$162
-
kW-mo/yr
|
- | - | |
02 | 2.2211: Use optimum temperature | $4,226 | - | - | - |
$4,226
-
MMBtu
|
- | |
03 | 2.1123: Install automatic stack damper | $943 | $375 | - | - |
$943
-
MMBtu
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $311 | $224 | - | - |
$311
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $5,244 | $18,858 |
$3,609
78,486
kWh
|
$1,635
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $2,248 | $9,540 |
$2,053
44,670
kWh
|
$195
-
kW-mo/yr
|
- | - | |
07 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $1,706 | - |
$438
-
kWh
|
$1,268
-
kW-mo/yr
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $2,734 | - | - | - | - | $2,734 | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,159,243 | $6,681,290 | - | - | - | $1,159,243 | |
TOTAL RECOMMENDED | $1,177,177 | $6,710,687 |
$6,460
130,972
kWh
|
$3,260
-
kW-mo/yr
|
$5,480
-
MMBtu
|
$1,161,977 | ||
TOTAL IMPLEMENTED | $1,170,302 | $6,710,312 |
$6,022
130,972
kWh
|
$1,992
-
kW-mo/yr
|
$311
-
MMBtu
|
$1,161,977 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs