Assessment Year | 2003 |
---|---|
Principal Product | Fence and Sign Posts |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
256,000
ft2
|
Annual Production | 120,000
ton
|
Production Hrs. Annual | 4,256
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $953,228 | 15,897,323 |
kWh
|
$0.060 |
Electricity Demand | $168,229 | 44,981 |
kW-mo/yr
|
$3.74 |
Electricity Fees | $10,049 | - |
|
- |
Natural Gas | $1,135,386 | 306,043 |
MMBtu
|
$3.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $504,237 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $255,326 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $38,692 | $7,174 | - | - |
$38,692
-
MMBtu
|
- | - | |
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $243,209 | $1,400,000 | - | - |
$243,209
-
MMBtu
|
- | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $2,757 | $516 | - | - |
$2,757
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,168 | $68,925 |
$15,151
252,512
kWh
|
$2,663
-
kW-mo/yr
|
- | $(-892.0) | $246 | |
05 | 4.446: Automate finishing process | $189,440 | $29,000 | - | - | - | $189,440 | - | |
06 | 2.4133: Use most efficient type of electric motors | $9,360 | $13,999 |
$7,964
132,749
kWh
|
$1,396
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,611 | $3,488 |
$3,243
54,050
kWh
|
$368
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $504,237 | $1,523,102 |
$26,358
439,311
kWh
|
$4,427
-
kW-mo/yr
|
$284,658
-
MMBtu
|
$188,548 | $246 | ||
TOTAL IMPLEMENTED | $255,326 | $1,414,515 |
$7,964
132,749
kWh
|
$1,396
-
kW-mo/yr
|
$245,966
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs