ITAC Assessment: IC0065
ITAC logo
ITAC Assessment: IC0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fence and Sign Posts
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 256,000
ft2
Annual Production 120,000
ton
Production Hrs. Annual 4,256
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $953,228 15,897,323
kWh
Electricity Demand $168,229 44,981
kW-mo/yr
Electricity Fees $10,049 -
Natural Gas $1,135,386 306,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $504,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $255,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $38,692 $7,174 - - $38,692
-
MMBtu
- -
02 2.2443: Re-use or recycle hot or cold process exhaust air $243,209 $1,400,000 - - $243,209
-
MMBtu
- -
03 2.4322: Use or replace with energy efficient substitutes $2,757 $516 - - $2,757
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $17,168 $68,925 $15,151
252,512
kWh
$2,663
-
kW-mo/yr
- $(-892.0) $246
05 4.446: Automate finishing process $189,440 $29,000 - - - $189,440 -
06 2.4133: Use most efficient type of electric motors $9,360 $13,999 $7,964
132,749
kWh
$1,396
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,611 $3,488 $3,243
54,050
kWh
$368
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $504,237 $1,523,102 $26,358
439,311
kWh
$4,427
-
kW-mo/yr
$284,658
-
MMBtu
$188,548 $246
TOTAL IMPLEMENTED $255,326 $1,414,515 $7,964
132,749
kWh
$1,396
-
kW-mo/yr
$245,966
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings