ITAC Assessment: IC0049
ITAC logo
ITAC Assessment: IC0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Zinc, Aluminum and Magnesium Die Castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 110,340
ft2
Annual Production 1,397,000
lb
Production Hrs. Annual 3,060
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,475 6,008,637
kWh
Electricity Demand $172,275 12,195
kW-mo/yr
Electricity Fees $81,756 -
Natural Gas $351,471 53,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $7,074 $11,051 $4,318
105,318
kWh
- $2,756
-
MMBtu
- - -
02 2.2511: Insulate bare equipment $1,672 $2,348 - - $1,672
-
MMBtu
- - -
03 2.4224: Upgrade controls on compressors $14,194 $33,428 $4,241
172,697
kWh
$9,953
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,069 $1,299 $273
6,658
kWh
$129
-
kW-mo/yr
- $267 - $400
05 2.1321: Replace fossil fuel equipment with electrical equipment $60,387 $190,035 $(-15,513.0)
(-378,360)
kWh
$(-11,530.0)
-
kW-mo/yr
$82,006
-
MMBtu
- - $5,424
06 2.2514: Cover open tanks $22,621 $19,645 $2,810
68,530
kWh
- $19,811
-
MMBtu
- - -
07 4.444: Install system to collect scrap $16,357 $24,000 - - - $16,357 - -
08 4.211: Consider use / purchase of bulk materials where possible $3,570 - - - - - $3,570 -
TOTAL RECOMMENDED $126,944 $281,806 $(-3,871.0)
(-25,157)
kWh
$(-1,448.0)
-
kW-mo/yr
$106,245
-
MMBtu
$16,624 $3,570 $5,824
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs