ITAC Assessment: IC0045
ITAC logo
ITAC Assessment: IC0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Gifts and Collectibles
NAICS
n/a
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 440,000
ft2
Annual Production 8,300,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,834 5,562,148
kWh
Electricity Demand $167,121 13,544
kW-mo/yr
Electricity Fees $528 -
Natural Gas $90,362 20,974
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $7,422 $1,320 n/a $3,170
79,257
kWh
$2,876
-
kW-mo/yr
- - $505 $871
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,857 $7,199 n/a $865
21,637
kWh
$365
-
kW-mo/yr
- - $880 $747
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,831 $62,835 n/a $7,787
194,665
kWh
$7,065
-
kW-mo/yr
- - $(-717.0) $(-304.0)
04 2.7135: Install occupancy sensors $4,970 $12,088 n/a $3,650
91,228
kWh
$1,320
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $251 $223 n/a $127
3,173
kWh
$124
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $166 $635 n/a $87
2,179
kWh
$79
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $910 $625 n/a $453
11,313
kWh
$457
-
kW-mo/yr
- - - -
08 2.2437: Recover waste heat from equipment $990 $734 n/a - - - $990
-
MMBtu
- -
09 2.8114: Change rate schedules or other changes in utility service $36,638 - n/a - $(-11,024.0)
-
kW-mo/yr
$47,662 - - -
TOTAL RECOMMENDED $68,035 $85,659 $16,139
403,452
kWh
$1,262
-
kW-mo/yr
$47,662 $990
-
MMBtu
$668 $1,314
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings