Assessment Year | 2002 |
---|---|
Principal Product | Gifts and Collectibles |
NAICS |
n/a
|
SIC | 3269: Pottery Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
440,000
ft2
|
Annual Production | 8,300,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,834 | 5,562,148 |
kWh
|
$0.040 |
Electricity Demand | $167,121 | 13,544 |
kW-mo/yr
|
$12.34 |
Electricity Fees | $528 | - |
|
- |
Natural Gas | $90,362 | 20,974 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $7,422 | $1,320 | n/a |
$3,170
79,257
kWh
|
$2,876
-
kW-mo/yr
|
- | - | $505 | $871 |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,857 | $7,199 | n/a |
$865
21,637
kWh
|
$365
-
kW-mo/yr
|
- | - | $880 | $747 |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,831 | $62,835 | n/a |
$7,787
194,665
kWh
|
$7,065
-
kW-mo/yr
|
- | - | $(-717.0) | $(-304.0) |
04 | 2.7135: Install occupancy sensors | $4,970 | $12,088 | n/a |
$3,650
91,228
kWh
|
$1,320
-
kW-mo/yr
|
- | - | - | - |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $251 | $223 | n/a |
$127
3,173
kWh
|
$124
-
kW-mo/yr
|
- | - | - | - |
06 | 2.4221: Install compressor air intakes in coolest locations | $166 | $635 | n/a |
$87
2,179
kWh
|
$79
-
kW-mo/yr
|
- | - | - | - |
07 | 2.4133: Use most efficient type of electric motors | $910 | $625 | n/a |
$453
11,313
kWh
|
$457
-
kW-mo/yr
|
- | - | - | - |
08 | 2.2437: Recover waste heat from equipment | $990 | $734 | n/a | - | - | - |
$990
-
MMBtu
|
- | - |
09 | 2.8114: Change rate schedules or other changes in utility service | $36,638 | - | n/a | - |
$(-11,024.0)
-
kW-mo/yr
|
$47,662 | - | - | - |
TOTAL RECOMMENDED | $68,035 | $85,659 |
$16,139
403,452
kWh
|
$1,262
-
kW-mo/yr
|
$47,662 |
$990
-
MMBtu
|
$668 | $1,314 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs