ITAC Assessment: IC0036
ITAC logo
ITAC Assessment: IC0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic Packaging Film, Coated and Laminated
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 76,000
ft2
Annual Production 11,519,000
lb
Production Hrs. Annual 7,368
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,010 5,504,246
kWh
Electricity Demand $94,126 12,667
kW-mo/yr
Electricity Fees $39,655 -
Natural Gas $375,259 69,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $144,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,908 $13,275 $4,340
78,911
kWh
$958
-
kW-mo/yr
- $(-274.0) - $(-116.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,335 $22,479 $5,173
94,053
kWh
$1,138
-
kW-mo/yr
- $(-24.0) - $48 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,457 $2,900 $4,473
81,348
kWh
$984
-
kW-mo/yr
- - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,201 $53,875 $12,658
230,139
kWh
$(-557.0)
-
kW-mo/yr
$21,100
-
MMBtu
- - - -
05 2.6232: Install set-back timers $1,686 $582 - - $1,686
-
MMBtu
- - - -
06 2.2443: Re-use or recycle hot or cold process exhaust air $50,899 $6,720 - - $50,899
-
MMBtu
- - - -
07 2.2443: Re-use or recycle hot or cold process exhaust air $14,346 $7,100 - - $14,346
-
MMBtu
- - - -
08 4.447: Automate payroll system $54,800 $9,262 - - - $12,300 $42,500 - -
09 2.7243: Improve air circulation with destratification fans / other methods $33,746 $19,500 $(-56.0)
(-1,011)
kWh
$(-238.0)
-
kW-mo/yr
- $34,218 - - $(-178.0)
-
Tgal
TOTAL RECOMMENDED $205,378 $135,693 $26,588
483,440
kWh
$2,285
-
kW-mo/yr
$88,031
-
MMBtu
$46,220 $42,500 $(-68.0) $(-178.0)
-
Tgal
TOTAL IMPLEMENTED $144,357 $72,757 $17,131
311,487
kWh
$427
-
kW-mo/yr
$71,999
-
MMBtu
$12,300 $42,500 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs