Assessment Year | 2002 |
---|---|
Principal Product | Plastic Packaging Film, Coated and Laminated |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
76,000
ft2
|
Annual Production | 11,519,000
lb
|
Production Hrs. Annual | 7,368
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,010 | 5,504,246 |
kWh
|
$0.049 |
Electricity Demand | $94,126 | 12,667 |
kW-mo/yr
|
$7.43 |
Electricity Fees | $39,655 | - |
|
- |
Natural Gas | $375,259 | 69,183 |
MMBtu
|
$5.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $205,378 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $144,357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,908 | $13,275 |
$4,340
78,911
kWh
|
$958
-
kW-mo/yr
|
- | $(-274.0) | - | $(-116.0) | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,335 | $22,479 |
$5,173
94,053
kWh
|
$1,138
-
kW-mo/yr
|
- | $(-24.0) | - | $48 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,457 | $2,900 |
$4,473
81,348
kWh
|
$984
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,201 | $53,875 |
$12,658
230,139
kWh
|
$(-557.0)
-
kW-mo/yr
|
$21,100
-
MMBtu
|
- | - | - | - | |
05 | 2.6232: Install set-back timers | $1,686 | $582 | - | - |
$1,686
-
MMBtu
|
- | - | - | - | |
06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $50,899 | $6,720 | - | - |
$50,899
-
MMBtu
|
- | - | - | - | |
07 | 2.2443: Re-use or recycle hot or cold process exhaust air | $14,346 | $7,100 | - | - |
$14,346
-
MMBtu
|
- | - | - | - | |
08 | 4.447: Automate payroll system | $54,800 | $9,262 | - | - | - | $12,300 | $42,500 | - | - | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $33,746 | $19,500 |
$(-56.0)
(-1,011)
kWh
|
$(-238.0)
-
kW-mo/yr
|
- | $34,218 | - | - |
$(-178.0)
-
Tgal
|
|
TOTAL RECOMMENDED | $205,378 | $135,693 |
$26,588
483,440
kWh
|
$2,285
-
kW-mo/yr
|
$88,031
-
MMBtu
|
$46,220 | $42,500 | $(-68.0) |
$(-178.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $144,357 | $72,757 |
$17,131
311,487
kWh
|
$427
-
kW-mo/yr
|
$71,999
-
MMBtu
|
$12,300 | $42,500 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs