ITAC Assessment: IC0033
ITAC logo
ITAC Assessment: IC0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Street Sweepers
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $100
M
to 500
M
# of Employees 375
Plant Area 300,000
ft2
Annual Production 950
pieces
Production Hrs. Annual 5,610
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,112 5,268,366
kWh
Electricity Demand $141,368 12,054
kW-mo/yr
Electricity Fees $26,251 -
Natural Gas $341,948 44,082
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,405 $97,350 $16,640
396,178
kWh
$9,940
-
kW-mo/yr
- $(-1,527.0) - $(-648.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,622 $5,604 $918
21,861
kWh
$549
-
kW-mo/yr
- $10 - $145 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,219 $1,700 $1,389
33,043
kWh
$1,830
-
kW-mo/yr
- - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $11,179 $15,000 - - $11,179
-
MMBtu
- - - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $13,369 $27,400 - - $13,369
-
MMBtu
- - - -
06 4.322: Eliminate old stock and modify inventory control $43,200 $8,500 - - - - $43,200 - -
07 3.1163: Use plastic pallets instead of wood $10,750 $22,000 - - - - - $10,750 -
08 3.1181: Eliminate a by-product $6,316 $72,000 - - - - - - $6,316
TOTAL RECOMMENDED $114,060 $249,554 $18,947
451,082
kWh
$12,319
-
kW-mo/yr
$24,548
-
MMBtu
$(-1,517.0) $43,200 $10,247 $6,316
TOTAL IMPLEMENTED $39,996 $126,654 $18,947
451,082
kWh
$12,319
-
kW-mo/yr
- $(-1,517.0) - $10,247 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs