ITAC Assessment: LT0007
ITAC logo
ITAC Assessment: LT0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HARDWOOD DIMENSION STOCK
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area
n/a
Annual Production 1,000
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,535 703,986
kWh
Natural Gas $40,596 6,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,869

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $444 $463 $444
5,862
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $1,468 $960 $1,468
21,688
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $401 - $401
7,913
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $133 $100 $133
2,345
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $18,375 $38,680 - $18,375
-
MMBtu
TOTAL RECOMMENDED $20,821 $40,203 $2,446
37,808
kWh
$18,375
-
MMBtu
TOTAL IMPLEMENTED $1,869 $960 $1,869
29,601
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs