| Assessment Year | 2002 |
|---|---|
| Principal Product | Beer |
| NAICS |
n/a
|
| SIC | 2082: Malt Beverages |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
51,000
ft2
|
| Annual Production | 46,000
bbl
|
| Production Hrs. Annual | 6,324
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $35,115 | 889,537 |
kWh
|
$0.039 |
| Electricity Demand | $32,181 | 2,616 |
kW-mo/yr
|
$12.30 |
| Electricity Fees | $10,865 | - |
|
- |
| Natural Gas | $41,231 | 8,246 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,701 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,405 | $4,651 |
$843
16,532
kWh
|
$641
-
kW-mo/yr
|
- | - | $(-79.0) | |
| 02 | 2.7135: Install occupancy sensors | $497 | $780 |
$412
8,075
kWh
|
$85
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,590 | $500 |
$1,758
34,470
kWh
|
$832
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,379 | - |
$747
14,663
kWh
|
$632
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,000 | $750 |
$542
10,630
kWh
|
$458
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $10,830 | $33,832 | - | - |
$10,830
-
MMBtu
|
- | - | |
| 07 | 4.445: Install equipment to move product | $39,000 | $240,000 | - | - | - | $39,000 | - | |
| TOTAL RECOMMENDED | $56,701 | $280,513 |
$4,302
84,370
kWh
|
$2,648
-
kW-mo/yr
|
$10,830
-
MMBtu
|
$39,000 | $(-79.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs