ITAC Assessment: IC0027
ITAC logo
ITAC Assessment: IC0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 51,000
ft2
Annual Production 46,000
bbl
Production Hrs. Annual 6,324
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,115 889,537
kWh
Electricity Demand $32,181 2,616
kW-mo/yr
Electricity Fees $10,865 -
Natural Gas $41,231 8,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,405 $4,651 $843
16,532
kWh
$641
-
kW-mo/yr
- - $(-79.0)
02 2.7135: Install occupancy sensors $497 $780 $412
8,075
kWh
$85
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,590 $500 $1,758
34,470
kWh
$832
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,379 - $747
14,663
kWh
$632
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,000 $750 $542
10,630
kWh
$458
-
kW-mo/yr
- - -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $10,830 $33,832 - - $10,830
-
MMBtu
- -
07 4.445: Install equipment to move product $39,000 $240,000 - - - $39,000 -
TOTAL RECOMMENDED $56,701 $280,513 $4,302
84,370
kWh
$2,648
-
kW-mo/yr
$10,830
-
MMBtu
$39,000 $(-79.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs