Assessment Year | 2002 |
---|---|
Principal Product | Electropolishing |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
40,000
ft2
|
Annual Production | 55,000,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,934 | 2,774,018 |
kWh
|
$0.051 |
Electricity Demand | $30,678 | 27,613 |
kW-mo/yr
|
$1.11 |
Electricity Fees | $30,879 | - |
|
- |
Natural Gas | $103,625 | 12,044 |
MMBtu
|
$8.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,926 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,947 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $945 | $8,326 |
$814
12,313
kWh
|
$60
-
kW-mo/yr
|
$9 | - | $62 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,379 | $25,075 |
$8,223
125,252
kWh
|
$273
-
kW-mo/yr
|
$518 | - | $1,365 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $102 | $150 |
$94
1,435
kWh
|
$8
-
kW-mo/yr
|
- | - | - | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $205,600 | $100,000 | - | - | $205,600 | - | - | |
05 | 4.426: Modify workload | $77,900 | $23,900 | - | - | $77,100 | $800 | - | |
TOTAL RECOMMENDED | $294,926 | $157,451 |
$9,131
139,000
kWh
|
$341
-
kW-mo/yr
|
$283,227 | $800 | $1,427 | ||
TOTAL IMPLEMENTED | $78,947 | $32,376 |
$908
13,748
kWh
|
$68
-
kW-mo/yr
|
$77,109 | $800 | $62 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs