ITAC Assessment: IC0017
ITAC logo
ITAC Assessment: IC0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Linens
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 33,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,590
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,928 790,647
kWh
Electricity Demand $30,357 2,498
kW-mo/yr
Electricity Fees $9,856 -
Natural Gas $195,541 30,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,046 $900 $5,833
132,610
kWh
$4,213
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $992 $5,433 $394
8,951
kWh
$284
-
kW-mo/yr
- $126 - $188
03 2.7142: Utilize higher efficiency lamps and/or ballasts $993 $3,540 $577
13,109
kWh
$416
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $495 $1,246 $139
3,154
kWh
$52
-
kW-mo/yr
- $220 - $84
05 2.6232: Install set-back timers $3,498 $1,020 - - $3,498
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $2,264 $1,714 - - $2,264
-
MMBtu
- - -
07 2.2136: Install / repair insulation on steam lines $1,979 $524 - - $1,979
-
MMBtu
- - -
08 4.454: Modify startup/shutdown times $14,500 - - - - $14,500 - -
09 4.447: Automate payroll system $5,500 $1,040 - - - $2,700 $2,800 -
TOTAL RECOMMENDED $40,267 $15,417 $6,943
157,824
kWh
$4,965
-
kW-mo/yr
$7,741
-
MMBtu
$17,546 $2,800 $272
TOTAL IMPLEMENTED $37,295 $11,353 $6,366
144,715
kWh
$4,549
-
kW-mo/yr
$5,762
-
MMBtu
$17,546 $2,800 $272
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs