ITAC Assessment: IC0016
ITAC logo
ITAC Assessment: IC0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel bar and wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 132
Plant Area 145,000
ft2
Annual Production 325,000,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,812 6,080,862
kWh
Electricity Demand $62,736 17,475
kW-mo/yr
Electricity Fees $87,675 -
Natural Gas $202,302 38,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,997 $4,100 n/a $6,948
124,066
kWh
$1,049
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $1,313 $6,313 n/a $1,080
19,285
kWh
$233
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $1,123 $2,769 n/a $1,085
19,372
kWh
$38
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,259 $1,795 n/a $424
7,574
kWh
$37
-
kW-mo/yr
- $596 - $202
05 2.2515: Use optimum thickness insulation $4,304 $3,360 n/a - - $4,304
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $668 $328 n/a - - $668
-
MMBtu
- - -
07 2.6232: Install set-back timers $2,723 $2,500 n/a - - $2,723
-
MMBtu
- - -
08 4.322: Eliminate old stock and modify inventory control $76,800 $8,000 n/a - - - - $76,800 -
TOTAL RECOMMENDED $96,187 $29,165 $9,537
170,297
kWh
$1,357
-
kW-mo/yr
$7,695
-
MMBtu
$596 $76,800 $202
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs