ITAC Assessment: IC0014
ITAC logo
ITAC Assessment: IC0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Forged Steel
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 100,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 2,295
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,484 2,116,189
kWh
Electricity Demand $74,394 6,115
kW-mo/yr
Electricity Fees $17,179 -
Natural Gas $865,822 203,418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,265 $1,530 $2,947
75,557
kWh
$4,318
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $160 $150 $61
1,563
kWh
$99
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $444 $968 $107
2,754
kWh
$46
-
kW-mo/yr
- $217 $74
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,536 $9,420 $817
20,939
kWh
$708
-
kW-mo/yr
- $11 -
05 2.7135: Install occupancy sensors $857 $907 $710
18,214
kWh
$147
-
kW-mo/yr
- - -
06 2.2136: Install / repair insulation on steam lines $12,728 $6,351 - - $12,728
-
MMBtu
- -
07 2.2136: Install / repair insulation on steam lines $1,980 $5,760 - - $1,980
-
MMBtu
- -
TOTAL RECOMMENDED $24,970 $25,086 $4,642
119,027
kWh
$5,318
-
kW-mo/yr
$14,708
-
MMBtu
$228 $74
TOTAL IMPLEMENTED $21,973 $13,641 $2,947
75,557
kWh
$4,318
-
kW-mo/yr
$14,708
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs