Assessment Year | 2001 |
---|---|
Principal Product | Speed Changers and Gears |
NAICS |
n/a
|
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $10 M to 50M |
# of Employees | 141 |
Plant Area |
277,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $264,067 | 6,674,043 |
kWh
|
$0.040 |
Electricity Demand | $133,129 | 12,531 |
kW-mo/yr
|
$10.62 |
Electricity Fees | $73,905 | - |
|
- |
Natural Gas | $313,677 | 76,942 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $315,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,700 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,637 | $8,900 |
$18,637
278,172
kWh
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,908 | $245 |
$1,908
28,472
kWh
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $2,511 | $4,312 | - |
$2,511
-
MMBtu
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,703 | $21,377 | n/a |
$2,685
40,078
kWh
|
- | $18 | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $552 | $1,250 |
$253
3,784
kWh
|
- | $198 | - | $101 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,700 | $178,925 | n/a |
$38,540
575,220
kWh
|
- | $(-2,840.0) | - | - |
07 | 4.652: Replace existing equipment with more suitable substitutes | $45,000 | $9,500 | - | - | $39,000 | $6,000 | - | |
08 | 4.426: Modify workload | $208,000 | $57,400 | n/a | - | - | $208,000 | - | - |
TOTAL RECOMMENDED | $315,011 | $281,909 |
$62,023
925,726
kWh
|
$2,511
-
MMBtu
|
$244,376 | $6,000 | $101 | ||
TOTAL IMPLEMENTED | $66,700 | $23,962 |
$18,890
281,956
kWh
|
$2,511
-
MMBtu
|
$39,198 | $6,000 | $101 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs