ITAC Assessment: IC0010
ITAC logo
ITAC Assessment: IC0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Speed Changers and Gears
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 277,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,067 6,674,043
kWh
Electricity Demand $133,129 12,531
kW-mo/yr
Electricity Fees $73,905 -
Natural Gas $313,677 76,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,637 $8,900 $18,637
278,172
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $1,908 $245 $1,908
28,472
kWh
- - - -
03 2.2511: Insulate bare equipment $2,511 $4,312 - $2,511
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,703 $21,377 n/a $2,685
40,078
kWh
- $18 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $552 $1,250 $253
3,784
kWh
- $198 - $101
06 2.7142: Utilize higher efficiency lamps and/or ballasts $35,700 $178,925 n/a $38,540
575,220
kWh
- $(-2,840.0) - -
07 4.652: Replace existing equipment with more suitable substitutes $45,000 $9,500 - - $39,000 $6,000 -
08 4.426: Modify workload $208,000 $57,400 n/a - - $208,000 - -
TOTAL RECOMMENDED $315,011 $281,909 $62,023
925,726
kWh
$2,511
-
MMBtu
$244,376 $6,000 $101
TOTAL IMPLEMENTED $66,700 $23,962 $18,890
281,956
kWh
$2,511
-
MMBtu
$39,198 $6,000 $101
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs