ITAC Assessment: IC0008
ITAC logo
ITAC Assessment: IC0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Custom Compound Resins
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 46,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,385 2,162,820
kWh
Electricity Demand $65,378 5,342
kW-mo/yr
Electricity Fees $9,581 -
Natural Gas $74,217 10,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,027

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,871 $1,200 $1,084
32,825
kWh
$787
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $418 - $242
7,343
kWh
$176
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $5,738 $12,553 $316
9,561
kWh
$5,422
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $2,513 $4,800 $495
15,009
kWh
$2,018
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $374 $1,462 $78
2,366
kWh
$40
-
kW-mo/yr
$193 - $63
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,715 $82,109 n/a $5,173
156,756
kWh
$4,542
-
kW-mo/yr
- - -
07 4.426: Modify workload $68,700 $7,200 - - $50,700 $18,000 -
TOTAL RECOMMENDED $89,329 $109,324 $7,388
223,860
kWh
$12,985
-
kW-mo/yr
$50,893 $18,000 $63
TOTAL IMPLEMENTED $8,027 $13,753 $1,642
49,729
kWh
$6,385
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs