Assessment Year | 2016 |
---|---|
Principal Product | Polypropylene cast film |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 81 |
Plant Area |
118,840
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $801,451 | 21,090,816 |
kWh
|
$0.038 |
Electricity Demand | $439,789 | 38,376 |
kW-mo/yr
|
$11.46 |
Electricity Fees | $28,758 | - |
|
- |
Natural Gas | $18,172 | 3,930 |
MMBtu
|
$4.62 |
TOTAL YEARLY COSTS | $1,288,170 | |||
RECOMMENDED SAVINGS* | $30,855 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,030 | $79,697 |
$11,797
309,674
kWh
|
$7,233
-
kW-mo/yr
|
|
02 | 2.7122: Disconnect ballasts | $5,350 | $3,960 |
$3,315
87,002
kWh
|
$2,035
-
kW-mo/yr
|
|
03 | 2.4133: Use most efficient type of electric motors | $2,116 | $5,057 |
$1,479
38,892
kWh
|
$637
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,878 | $328 |
$1,314
34,440
kWh
|
$564
-
kW-mo/yr
|
|
05 | 2.7135: Install occupancy sensors | $1,430 | $1,680 |
$1,430
37,538
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $914 | $386 |
$639
16,747
kWh
|
$275
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $137 | $70 |
$96
2,520
kWh
|
$41
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $30,855 | $91,178 |
$20,070
526,813
kWh
|
$10,785
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs