ITAC Assessment: UU0062
ITAC logo
ITAC Assessment: UU0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product boxes
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 206
Plant Area 180,190
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,858 2,839,886
kWh
Electricity Demand $98,504 12,477
kW-mo/yr
Electricity Fees $31,490 -
Natural Gas $40,708 7,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,525,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $12,920 $20,250 - - $12,920 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,404 $790 $650
21,600
kWh
$754
-
kW-mo/yr
- -
03 2.7144: Install spectral reflectors / delamp $380 $280 $200
6,600
kWh
$180
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $392 $1,990 $146
4,800
kWh
$246
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,690 $3,226 $726
23,800
kWh
$964
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $262 $440 $262
8,600
kWh
- - -
07 4.512: Condense operation into one building $2,508,360 $6,420,700 - - - $2,508,360
TOTAL RECOMMENDED $2,525,408 $6,447,676 $1,984
65,400
kWh
$2,144
-
kW-mo/yr
$12,920 $2,508,360
TOTAL IMPLEMENTED $1,404 $790 $650
21,600
kWh
$754
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings