| Assessment Year | 2016 |
|---|---|
| Principal Product | metal parts |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3449: Miscellaneous Structural Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
59,800
ft2
|
| Annual Production | 1,200,000
units
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | South Dakota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,922 | 1,161,752 |
kWh
|
$0.034 |
| Electricity Demand | $60,611 | 4,428 |
kW-mo/yr
|
$13.69 |
| Natural Gas | $6,534 | 1,116 |
MMBtu
|
$5.85 |
| TOTAL YEARLY COSTS | $107,067 | |||
| RECOMMENDED SAVINGS* | $16,879 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,263 | $19,592 |
$6,122
178,515
kWh
|
$6,141
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,791 | $384 |
$913
26,554
kWh
|
$878
-
kW-mo/yr
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,378 | $2,300 |
$717
20,894
kWh
|
$661
-
kW-mo/yr
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $673 | $30 |
$342
9,984
kWh
|
$331
-
kW-mo/yr
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $774 | $660 |
$394
11,488
kWh
|
$380
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $16,879 | $22,966 |
$8,488
247,435
kWh
|
$8,391
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs