ITAC Assessment: IA0559
ITAC logo
ITAC Assessment: IA0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product metal parts
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 59,800
ft2
Annual Production 1,200,000
units
Production Hrs. Annual 4,992
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,922 1,161,752
kWh
Electricity Demand $60,611 4,428
kW-mo/yr
Natural Gas $6,534 1,116
MMBtu
TOTAL YEARLY COSTS $107,067
RECOMMENDED SAVINGS* $16,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,263 $19,592 $6,122
178,515
kWh
$6,141
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,791 $384 $913
26,554
kWh
$878
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,378 $2,300 $717
20,894
kWh
$661
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $673 $30 $342
9,984
kWh
$331
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $774 $660 $394
11,488
kWh
$380
-
kW-mo/yr
TOTAL RECOMMENDED $16,879 $22,966 $8,488
247,435
kWh
$8,391
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs