ITAC Assessment: IA0558
ITAC logo
ITAC Assessment: IA0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal Parts
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 70,800
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,640
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,116 1,025,440
kWh
Electricity Demand $50,385 5,004
kW-mo/yr
Natural Gas $31,071 9,675
MMBtu
TOTAL YEARLY COSTS $144,572
RECOMMENDED SAVINGS* $14,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,276 $17,530 $5,997
97,972
kWh
$3,279
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,337 $441 $1,528
25,009
kWh
$809
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $981 $2,040 $981
16,031
kWh
- -
04 2.7135: Install occupancy sensors $589 $1,290 $589
9,592
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $374 $60 $245
4,004
kWh
$129
-
kW-mo/yr
-
06 2.7211: Clean and maintain refrigerant condensers and towers $352 $60 $145
2,363
kWh
$207
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $281 $337 $183
2,297
kWh
$98
-
kW-mo/yr
-
08 2.1213: Direct warmest air to combustion intake $242 $200 - - $242
-
MMBtu
TOTAL RECOMMENDED $14,432 $21,958 $9,668
157,268
kWh
$4,522
-
kW-mo/yr
$242
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs