Assessment Year | 2016 |
---|---|
Principal Product | Livestock Gates |
NAICS | 332323: Ornamental and Architectural Metal Work Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
62,336
ft2
|
Annual Production | 8,250,000
lb
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $180,238 | 2,903,280 |
kWh
|
$0.062 |
Electricity Demand | $96,360 | 9,468 |
kW-mo/yr
|
$10.18 |
Natural Gas | $141,854 | 25,568 |
MMBtu
|
$5.55 |
TOTAL YEARLY COSTS | $418,452 | |||
RECOMMENDED SAVINGS* | $50,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,034 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,574 | $23,858 |
$27,688
446,604
kWh
|
$8,886
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,085 | $9,800 |
$4,085
65,895
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,881 | $4,905 |
$2,881
46,461
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,796 | $3,898 |
$1,796
29,030
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,632 | $513 |
$1,146
18,532
kWh
|
$486
-
kW-mo/yr
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,391 | $462 | - | - |
$1,391
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,271 | $90 |
$958
15,392
kWh
|
$313
-
kW-mo/yr
|
- | |
08 | 2.1213: Direct warmest air to combustion intake | $880 | $120 | - | - |
$880
-
MMBtu
|
|
TOTAL RECOMMENDED | $50,510 | $43,646 |
$38,554
621,914
kWh
|
$9,685
-
kW-mo/yr
|
$2,271
-
MMBtu
|
||
TOTAL IMPLEMENTED | $45,034 | $33,384 |
$34,469
556,019
kWh
|
$9,685
-
kW-mo/yr
|
$880
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs