Assessment Year | 2016 |
---|---|
Principal Product | truck components |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $5 M to 10M |
# of Employees | 165 |
Plant Area |
100,000
ft2
|
Annual Production | 165
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,894 | 3,436,200 |
kWh
|
$0.038 |
Electricity Demand | $141,907 | 8,304 |
kW-mo/yr
|
$17.09 |
LPG | $349,358 | 31,899 |
MMBtu
|
$10.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,285 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $31,455 | $600 | - | - | $31,455 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,312 | $15,450 |
$5,966
159,603
kWh
|
$6,346
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $12,273 | $6,468 | - | - | $12,273 | - | |
04 | 2.2437: Recover waste heat from equipment | $6,406 | $5,000 | - | - | - |
$6,406
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $4,935 | $672 |
$2,651
70,945
kWh
|
$2,284
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,565 | $8,614 |
$1,567
41,903
kWh
|
$1,998
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,989 | $60 |
$1,086
29,040
kWh
|
$903
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,623 | $467 |
$884
23,628
kWh
|
$739
-
kW-mo/yr
|
- | - | |
09 | 2.7135: Install occupancy sensors | $330 | $1,200 |
$330
8,806
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $74,888 | $38,531 |
$12,484
333,925
kWh
|
$12,270
-
kW-mo/yr
|
$43,728 |
$6,406
-
MMBtu
|
||
TOTAL IMPLEMENTED | $49,285 | $26,331 |
$8,747
233,940
kWh
|
$9,083
-
kW-mo/yr
|
$31,455 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs