Assessment Year | 2016 |
---|---|
Principal Product | Custom Components |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
72,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,719 | 3,130,160 |
kWh
|
$0.059 |
Electricity Demand | $78,961 | 6,636 |
kW-mo/yr
|
$11.90 |
Natural Gas | $61,552 | 9,841 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,703 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $64,982 | $104,231 |
$50,000
853,244
kWh
|
$14,982
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,488 | $35 |
$5,082
86,724
kWh
|
$1,406
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $4,046 | $2,600 |
$4,046
69,064
kWh
|
- | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $3,573 | $1 |
$3,573
60,970
kWh
|
- | - | |
05 | 2.7446: Utilize sensors controlling roof and wall openings | $2,612 | $280 |
$238
4,060
kWh
|
- |
$2,374
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,216 | $390 |
$1,734
29,612
kWh
|
$482
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,487 | $35 |
$152
2,590
kWh
|
$1,335
-
kW-mo/yr
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $886 | $357 | - | - |
$886
-
MMBtu
|
|
TOTAL RECOMMENDED | $86,290 | $107,929 |
$64,825
1,106,264
kWh
|
$18,205
-
kW-mo/yr
|
$3,260
-
MMBtu
|
||
TOTAL IMPLEMENTED | $75,703 | $107,579 |
$59,353
1,012,890
kWh
|
$15,464
-
kW-mo/yr
|
$886
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs