Assessment Year | 2016 |
---|---|
Principal Product | Service equipment |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
206,000
ft2
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,782 | 3,016,061 |
kWh
|
$0.045 |
Electricity Demand | $141,930 | 8,244 |
kW-mo/yr
|
$17.22 |
Natural Gas | $156,256 | 21,231 |
MMBtu
|
$7.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,680 | $73,899 |
$11,428
254,341
kWh
|
$11,252
-
kW-mo/yr
|
|
02 | 2.4133: Use most efficient type of electric motors | $2,410 | $8,190 |
$1,271
28,304
kWh
|
$1,139
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,340 | $397 |
$1,234
27,508
kWh
|
$1,106
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,684 | $140 |
$888
19,760
kWh
|
$796
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $671 | $3,170 |
$671
14,928
kWh
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $1,127 | $4,280 |
$736
16,381
kWh
|
$391
-
kW-mo/yr
|
|
07 | 2.7135: Install occupancy sensors | $540 | $1,300 |
$540
12,034
kWh
|
- | |
TOTAL RECOMMENDED | $31,452 | $91,376 |
$16,768
373,256
kWh
|
$14,684
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $29,768 | $91,236 |
$15,880
353,496
kWh
|
$13,888
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs