ITAC Assessment: IA0545
ITAC logo
ITAC Assessment: IA0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Healthcare
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range less than $500
k
# of Employees 500
Plant Area 1,020,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,242 8,412,600
kWh
Electricity Demand $135,750 17,952
kW-mo/yr
Natural Gas $249,095 47,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.7262: Separate controls of air handlers from ac/ heating systems $37,834 $27,000 $31,065
652,620
kWh
$6,769
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $22,509 $115,341 $18,482
388,339
kWh
$4,027
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $9,979 $4,778 $9,979
209,611
kWh
- - -
04 2.8118: Check for accuracy of utility / power meters $5,172 $620 - - - $5,172
-
Tgal
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,267 $4,620 $3,502
73,584
kWh
$765
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $231 $292 - - $231
-
MMBtu
-
TOTAL RECOMMENDED $79,992 $152,651 $63,028
1,324,154
kWh
$11,561
-
kW-mo/yr
$231
-
MMBtu
$5,172
-
Tgal
TOTAL IMPLEMENTED $70,013 $147,873 $53,049
1,114,543
kWh
$11,561
-
kW-mo/yr
$231
-
MMBtu
$5,172
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs