ITAC Assessment: IA0535
ITAC logo
ITAC Assessment: IA0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 102,190
ft2
Annual Production 54,187,569
lb
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,273 6,019,400
kWh
Electricity Demand $125,811 12,238
kW-mo/yr
Electricity Fees $41,381 -
Natural Gas $173,335 28,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $4,967 $2,059 $3,959
71,036
kWh
$1,008
-
kW-mo/yr
-
02 2.1133: Adjust burners for efficient operation $845 $3,200 - - $845
-
MMBtu
03 2.4133: Use most efficient type of electric motors $2,020 $10,595 $1,475
26,482
kWh
$545
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,091 $70 $1,367
24,544
kWh
$724
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,318 $3,120 $1,018
18,270
kWh
$300
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $466 $710 $466
8,371
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $552 $1,391 $361
6,473
kWh
$191
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,259 $21,145 $8,646
155,176
kWh
$2,768
-
kW-mo/yr
$845
-
MMBtu
TOTAL IMPLEMENTED $10,862 $16,554 $8,285
148,703
kWh
$2,577
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs