ITAC Assessment: IA0526
ITAC logo
ITAC Assessment: IA0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Machined Parts
NAICS 332439: Other Metal Container Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 120,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,549 4,757,952
kWh
Electricity Demand $56,391 7,961
kW-mo/yr
Electricity Fees $12,740 -
Natural Gas $59,609 9,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $12,860 $845 $10,685
223,383
kWh
$2,175
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $2,840 $1,090 $2,840
59,405
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,290 $27,423 $7,717
161,442
kWh
$1,573
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,757 $460 - - $1,757
-
MMBtu
05 2.7135: Install occupancy sensors $571 $1,430 $571
11,945
kWh
- -
06 2.7442: Keep doors and windows shut when not on use $847 $4,000 - - $847
-
MMBtu
TOTAL RECOMMENDED $28,165 $35,248 $21,813
456,175
kWh
$3,748
-
kW-mo/yr
$2,604
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs