Assessment Year | 2014 |
---|---|
Principal Product | Food Packaging Equipment |
NAICS | 333993: Packaging Machinery Manufacturing |
SIC | 3565: Packaging Machinery |
Sales Range | $50 M to 100M |
# of Employees | 262 |
Plant Area |
140,000
ft2
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,067 | 1,604,000 |
kWh
|
$0.071 |
Electricity Demand | $37,712 | 4,524 |
kW-mo/yr
|
$8.34 |
Electricity Fees | $5,598 | - |
|
- |
Natural Gas | $30,528 | 4,572 |
MMBtu
|
$6.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,209 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,434 | $704 |
$2,598
36,512
kWh
|
$836
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,232 | $5,280 |
$932
13,104
kWh
|
$300
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $742 | $1,050 |
$561
7,888
kWh
|
$181
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $939 | $185 |
$699
9,841
kWh
|
$240
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $184 | $140 |
$139
1,957
kWh
|
$45
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $149 | $210 |
$149
2,091
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,190 | $8,793 |
$2,190
30,809
kWh
|
- | - | |
08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $462 | $80 | - | - |
$462
-
MMBtu
|
|
09 | 2.2437: Recover waste heat from equipment | $1,803 | $2,302 | - | - |
$1,803
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,135 | $18,744 |
$7,268
102,202
kWh
|
$1,602
-
kW-mo/yr
|
$2,265
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,209 | $17,554 |
$6,568
92,357
kWh
|
$1,376
-
kW-mo/yr
|
$2,265
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs