Assessment Year | 2014 |
---|---|
Principal Product | Blow Molded Plastic Parts |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
193,000
ft2
|
Annual Production | 11,750,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $473,396 | 13,595,000 |
kWh
|
$0.035 |
Electricity Demand | $341,402 | 28,383 |
kW-mo/yr
|
$12.03 |
Electricity Fees | $26,073 | - |
|
- |
Natural Gas | $35,272 | 4,877 |
MMBtu
|
$7.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,063 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7233: Use properly designed and sized hvac equipment | $21,416 | $3,325 | - | - |
$21,416
-
MMBtu
|
|
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,176 | $380 | - | - |
$4,176
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $6,894 | $14,469 |
$4,253
121,177
kWh
|
$2,641
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $848 | $402 |
$848
24,161
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,610 | $392 |
$3,462
98,604
kWh
|
$2,148
-
kW-mo/yr
|
- | |
06 | 2.2691: Shut off cooling if cold outside air will cool process | $5,119 | $140,200 |
$3,349
95,400
kWh
|
$1,770
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $44,063 | $159,168 |
$11,912
339,342
kWh
|
$6,559
-
kW-mo/yr
|
$25,592
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,096 | $18,566 |
$7,715
219,781
kWh
|
$4,789
-
kW-mo/yr
|
$25,592
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs