| Assessment Year | 2013 |
|---|---|
| Principal Product | Spray Dried Porcine Product |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 33 |
| Plant Area |
50,551
ft2
|
| Annual Production | 18,500,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $298,828 | 3,626,520 |
kWh
|
$0.082 |
| Electricity Demand | $89,000 | 10,476 |
kW-mo/yr
|
$8.50 |
| Natural Gas | $390,799 | 80,992 |
MMBtu
|
$4.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $68,682 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $67,340 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,483 | $4,993 |
$7,280
74,131
kWh
|
$1,203
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,279 | $1,198 |
$1,098
13,328
kWh
|
$181
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $2,933 | $2,826 |
$2,933
35,584
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $9,686 | $7,803 | - | - |
$9,686
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,342 | $1,000 | - | - |
$13,342
-
MMBtu
|
|
| 06 | 2.1213: Direct warmest air to combustion intake | $1,342 | $500 | - | - |
$1,342
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $792 | $650 |
$681
8,265
kWh
|
$111
-
kW-mo/yr
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $576 | $25 |
$494
5,990
kWh
|
$82
-
kW-mo/yr
|
- | |
| 09 | 2.4131: Size electric motors for peak operating efficiency | $4,196 | $10,318 |
$3,474
42,173
kWh
|
$722
-
kW-mo/yr
|
- | |
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,053 | $13,600 |
$22,827
277,025
kWh
|
$3,226
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $68,682 | $42,913 |
$38,787
456,496
kWh
|
$5,525
-
kW-mo/yr
|
$24,370
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $67,340 | $42,413 |
$38,787
456,496
kWh
|
$5,525
-
kW-mo/yr
|
$23,028
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs