Assessment Year | 2013 |
---|---|
Principal Product | Spray Dried Porcine Product |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 33 |
Plant Area |
50,551
ft2
|
Annual Production | 18,500,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $298,828 | 3,626,520 |
kWh
|
$0.082 |
Electricity Demand | $89,000 | 10,476 |
kW-mo/yr
|
$8.50 |
Natural Gas | $390,799 | 80,992 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,682 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,340 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,483 | $4,993 |
$7,280
74,131
kWh
|
$1,203
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,279 | $1,198 |
$1,098
13,328
kWh
|
$181
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $2,933 | $2,826 |
$2,933
35,584
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $9,686 | $7,803 | - | - |
$9,686
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,342 | $1,000 | - | - |
$13,342
-
MMBtu
|
|
06 | 2.1213: Direct warmest air to combustion intake | $1,342 | $500 | - | - |
$1,342
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $792 | $650 |
$681
8,265
kWh
|
$111
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $576 | $25 |
$494
5,990
kWh
|
$82
-
kW-mo/yr
|
- | |
09 | 2.4131: Size electric motors for peak operating efficiency | $4,196 | $10,318 |
$3,474
42,173
kWh
|
$722
-
kW-mo/yr
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,053 | $13,600 |
$22,827
277,025
kWh
|
$3,226
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $68,682 | $42,913 |
$38,787
456,496
kWh
|
$5,525
-
kW-mo/yr
|
$24,370
-
MMBtu
|
||
TOTAL IMPLEMENTED | $67,340 | $42,413 |
$38,787
456,496
kWh
|
$5,525
-
kW-mo/yr
|
$23,028
-
MMBtu
|
||