ITAC Assessment: IA0506
ITAC logo
ITAC Assessment: IA0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Machined OEM Components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 130,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,965 2,855,520
kWh
Electricity Demand $134,507 8,616
kW-mo/yr
Natural Gas $5,594 919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $24,332 $5,000 - $24,332
-
kW-mo/yr
-
02 2.8112: Combine utility meters $31,535 $40,000 - $31,535
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $932 $500 $543
15,991
kWh
$389
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,271 $10,035 $1,260
37,065
kWh
$1,011
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $751 $4,480 $421
12,373
kWh
- $330
06 2.7135: Install occupancy sensors $444 $1,450 $444
13,048
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $830 $177 $460
13,522
kWh
$370
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,278 $11,250 $3,006
88,411
kWh
$1,272
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,373 $72,892 $6,134
180,410
kWh
$58,909
-
kW-mo/yr
$330
TOTAL IMPLEMENTED $5,228 $16,642 $3,128
91,999
kWh
$1,770
-
kW-mo/yr
$330
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs