ITAC Assessment: IA0503
ITAC logo
ITAC Assessment: IA0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product electric motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 317
Plant Area 140,000
ft2
Annual Production 22,000
units
Production Hrs. Annual 4,810
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,431 4,470,600
kWh
Electricity Demand $148,610 9,426
kW-mo/yr
Natural Gas $6,396 1,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,895 $202,405 $6,050
181,818
kWh
$7,045
-
kW-mo/yr
- $10,800
02 2.4221: Install compressor air intakes in coolest locations $3,231 $470 $1,415
47,018
kWh
$1,816
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $975 $2,238 $975
32,250
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $530 $105 $232
7,696
kWh
$298
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $15,108 $8,304 - - $15,108 -
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,063 $2,204 $1,063
35,401
kWh
- - -
TOTAL RECOMMENDED $44,802 $215,726 $9,735
304,183
kWh
$9,159
-
kW-mo/yr
$15,108 $10,800
TOTAL IMPLEMENTED $17,146 $12,746 $2,038
67,651
kWh
- $15,108 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs