Assessment Year | 2013 |
---|---|
Principal Product | chemical reagents |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
170,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $490,046 | 6,879,600 |
kWh
|
$0.071 |
Electricity Demand | $52,529 | 12,962 |
kW-mo/yr
|
$4.05 |
Electricity Fees | $17,402 | - |
|
- |
Natural Gas | $91,680 | 28,708 |
MMBtu
|
$3.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $7,492 | $3,371 | - | - | - | $7,492 | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,315 | $700 |
$1,170
16,529
kWh
|
$145
-
kW-mo/yr
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $521 | $800 |
$521
7,363
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,972 | $830 |
$2,609
36,852
kWh
|
$363
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,513 | $210 |
$1,329
18,772
kWh
|
$184
-
kW-mo/yr
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,445 | $4,953 |
$1,269
17,926
kWh
|
$176
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $1,768 | $3,800 |
$1,768
24,966
kWh
|
- | - | - | |
08 | 2.2113: Repair or replace steam traps | $1,343 | $1,425 | - | - |
$1,343
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $18,369 | $16,089 |
$8,666
122,408
kWh
|
$868
-
kW-mo/yr
|
$1,343
-
MMBtu
|
$7,492 | ||
TOTAL IMPLEMENTED | $1,768 | $3,800 |
$1,768
24,966
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs