Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product envelopes
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 88,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,300 5,865,000
kWh
Electricity Demand $63,478 10,243
kW-mo/yr
Electricity Fees $11,326 -
Natural Gas $13,422 2,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $30,064 $35,700 $14,785
467,872
kWh
$3,940
-
kW-mo/yr
$11,340
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $649 $300 $516
16,210
kWh
$133
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,544 $2,000 $2,348
74,302
kWh
$196
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,214 $4,030 $1,214
38,404
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $561 $35 $443
14,016
kWh
$118
-
kW-mo/yr
-
06 2.7241: Install outside air damper / economizer on hvac unit $3,198 $6,000 $3,198
101,206
kWh
- -
TOTAL RECOMMENDED $38,230 $48,065 $22,504
712,010
kWh
$4,387
-
kW-mo/yr
$11,340
TOTAL IMPLEMENTED $1,210 $335 $959
30,226
kWh
$251
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs