Assessment Year | 2013 |
---|---|
Principal Product | envelopes |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
88,000
ft2
|
Annual Production | 2,000,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $186,300 | 5,865,000 |
kWh
|
$0.032 |
Electricity Demand | $63,478 | 10,243 |
kW-mo/yr
|
$6.20 |
Electricity Fees | $11,326 | - |
|
- |
Natural Gas | $13,422 | 2,206 |
MMBtu
|
$6.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,230 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,210 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $30,064 | $35,700 |
$14,785
467,872
kWh
|
$3,940
-
kW-mo/yr
|
$11,340 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $649 | $300 |
$516
16,210
kWh
|
$133
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,544 | $2,000 |
$2,348
74,302
kWh
|
$196
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $1,214 | $4,030 |
$1,214
38,404
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $561 | $35 |
$443
14,016
kWh
|
$118
-
kW-mo/yr
|
- | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $3,198 | $6,000 |
$3,198
101,206
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,230 | $48,065 |
$22,504
712,010
kWh
|
$4,387
-
kW-mo/yr
|
$11,340 | ||
TOTAL IMPLEMENTED | $1,210 | $335 |
$959
30,226
kWh
|
$251
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs