ITAC Assessment: IA0492
ITAC logo
ITAC Assessment: IA0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Thermoformed plastic parts
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 100,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,430
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,078 1,343,808
kWh
Natural Gas $5,390 696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,544 $585 $3,544
38,763
kWh
02 2.4322: Use or replace with energy efficient substitutes $4,344 $720 $4,344
47,590
kWh
03 2.7135: Install occupancy sensors $755 $1,617 $755
8,271
kWh
04 2.4221: Install compressor air intakes in coolest locations $914 $490 $914
9,996
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,082 $105 $2,082
22,806
kWh
06 2.4239: Eliminate or reduce compressed air usage $1,450 $590 $1,450
15,950
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $230 $35 $230
2,521
kWh
TOTAL RECOMMENDED $13,319 $4,142 $13,319
145,897
kWh
TOTAL IMPLEMENTED $8,643 $2,922 $8,643
94,624
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs