ITAC Assessment: IA0491
ITAC logo
ITAC Assessment: IA0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Thermoset Composites
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 189
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,097 8,297,592
kWh
Electricity Demand $210,073 20,037
kW-mo/yr
Electricity Fees $8,953 -
Natural Gas $1,137,674 206,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,631 $600 $1,706
45,350
kWh
$925
-
kW-mo/yr
-
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,278 $530 $1,353
35,827
kWh
$925
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,619 $10,841 $2,999
79,560
kWh
$1,620
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,510 $18,286 $4,226
112,061
kWh
$2,284
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $2,096 $2,626 $2,096
55,603
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $363 $175 - - $363
-
MMBtu
TOTAL RECOMMENDED $18,497 $33,058 $12,380
328,401
kWh
$5,754
-
kW-mo/yr
$363
-
MMBtu
TOTAL IMPLEMENTED $16,219 $32,528 $11,027
292,574
kWh
$4,829
-
kW-mo/yr
$363
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs