ITAC Assessment: IA0490
ITAC logo
ITAC Assessment: IA0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Storm doors and windows
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 134,517
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 3,402
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,809 2,429,000
kWh
Electricity Demand $42,360 7,130
kW-mo/yr
Natural Gas $18,041 2,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,645 $19,693 $2,914
82,806
kWh
$1,731
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $333 $478 $333
9,482
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,882 $1,500 $3,691
104,850
kWh
$2,191
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $4,416 $1,260 - - $4,416
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $2,136 $1,440 $1,394
39,596
kWh
$742
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,412 $24,371 $8,332
236,734
kWh
$4,664
-
kW-mo/yr
$4,416
-
MMBtu
TOTAL IMPLEMENTED $14,943 $22,453 $6,605
187,656
kWh
$3,922
-
kW-mo/yr
$4,416
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs