Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fan clutches/transmission coolers
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 82,500
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,601 933,470
kWh
Electricity Demand $21,558 2,565
kW-mo/yr
Natural Gas $1,691 220
MMBtu
LPG $1,704 221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.7144: Install spectral reflectors / delamp $2,397 $1,830 $1,888
19,637
kWh
$509
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $9,603 $5,830 $7,767
80,891
kWh
$1,836
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,133 - $2,752
28,722
kWh
$381
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $1,873 $500 $1,436
3,224
kWh
$437
-
kW-mo/yr
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,948 $8,500 - - $5,948
-
Tgal
- -
06 2.5194: Redesign process $28,000 $20,000 - - - $28,000 -
07 2.2314: Replace heat treating oven with more efficient unit $2,400 $600 - - - - $2,400
TOTAL RECOMMENDED $53,354 $37,260 $13,843
132,474
kWh
$3,163
-
kW-mo/yr
$5,948
-
Tgal
$28,000 $2,400
TOTAL IMPLEMENTED $17,006 $8,160 $13,843
132,474
kWh
$3,163
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs