Assessment Year | 1999 |
---|---|
Principal Product | Fan clutches/transmission coolers |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
82,500
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,601 | 933,470 |
kWh
|
$0.096 |
Electricity Demand | $21,558 | 2,565 |
kW-mo/yr
|
$8.40 |
Natural Gas | $1,691 | 220 |
MMBtu
|
$7.69 |
LPG | $1,704 | 221 |
MMBtu
|
$7.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,006 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $2,397 | $1,830 |
$1,888
19,637
kWh
|
$509
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $9,603 | $5,830 |
$7,767
80,891
kWh
|
$1,836
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,133 | - |
$2,752
28,722
kWh
|
$381
-
kW-mo/yr
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,873 | $500 |
$1,436
3,224
kWh
|
$437
-
kW-mo/yr
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,948 | $8,500 | - | - |
$5,948
-
Tgal
|
- | - | |
06 | 2.5194: Redesign process | $28,000 | $20,000 | - | - | - | $28,000 | - | |
07 | 2.2314: Replace heat treating oven with more efficient unit | $2,400 | $600 | - | - | - | - | $2,400 | |
TOTAL RECOMMENDED | $53,354 | $37,260 |
$13,843
132,474
kWh
|
$3,163
-
kW-mo/yr
|
$5,948
-
Tgal
|
$28,000 | $2,400 | ||
TOTAL IMPLEMENTED | $17,006 | $8,160 |
$13,843
132,474
kWh
|
$3,163
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs